Midstream & Gas Processing

Gas processing plants, compressor stations, pipelines and terminals

Natural gas processing plants, compressor stations, pipelines and terminals handle high-pressure flammable gas and toxic streams across many sites, often with small crews and a steady flow of contractors. Safety First Group gives midstream operators the process safety, industrial hygiene, on-site staff and training that this work calls for.

Where the hazards are in a gas plant

A gas processing plant puts several hazard areas inside one fence line: amine treating, dehydration, NGL recovery and fractionation, compression, flares and storage. Each brings its own release, fire and exposure scenarios, and each one changes when a unit is expanded.

PSM for gas processing plants

OSHA’s Process Safety Management standard, 29 CFR 1910.119, applies to processes with 10,000 pounds or more of flammable gas or liquid, which includes most gas plants. We develop PSM programs and procedures covering all 14 elements, and keep them current as the plant changes.

PHA facilitation for process units and expansions

Our process safety team facilitates HAZOP, LOPA and What-If studies for process units and expansions, and documents the results so findings turn into tracked recommendations. When a management of change triggers a new PHA, we can staff the review quickly so the change is not held up.

Exposure assessment for H2S, benzene and noise

Our industrial hygienists assess exposure to hydrogen sulfide, benzene and noise with qualitative and quantitative assessments. The results drive your monitoring plans, PPE requirements and hearing conservation.

On-site safety staff for turnarounds and expansions

From a single safety professional for a project to nested staff on every shift, we scale on-site EHS support to turnarounds, expansions and routine operations, up to 24/7/365.

Site orientation and training

Through SafetyAnywhere, employees and contractors complete site orientation and regulatory training online, so crews are job-ready sooner, because orientation is done before arrival. We also deliver regulatory, process safety and equipment training on site.

Gas plant and midstream experience

Our COO led the team that designed, built, shipped, installed and commissioned a 1.2 Bcf/d gas plant in Venezuela in 18 months, and our project management teams have provided commissioning support for DCP Midstream. Our teams have also supported Kinder Morgan, Targa Resources, Crestwood Midstream, Whitewater Midstream, Durango Midstream, Chevron Pipeline and Colonial Pipeline.

Call (281) 803-9775 or request a quote to talk about your plant or pipeline.

Related services

FAQ

Questions about Midstream & Gas Processing

What is the difference between a HAZOP and a LOPA?

A HAZOP is a systematic team review of each part of a process for deviations from design intent and the hazards they could cause. A LOPA, layer of protection analysis, takes specific scenarios and tests whether the independent safeguards in place are enough. We facilitate both and help you choose the method that fits the complexity of the process and its hazards.

Do you support natural gas processing plants?

Yes. We facilitate HAZOP, LOPA and What-If studies for gas plant units and expansions, develop PSM programs and procedures, assess exposure to H2S, benzene and noise, and provide on-site safety staff and training. Our COO led the team that designed, built and commissioned a 1.2 Bcf/d gas plant in Venezuela in 18 months.